Product manual
KPMWC00905-10EN - page 20/24
• The water in the system must be particularly clean and all traces of oil or rust must be removed. A mechanical water
filter must be installed on the machine’s inlet piping.
Space requirements
Every side of the machine must be accessible for all post-installation maintenance activities.
In particular, service clearance has to be provided at one end of the unit for possible removal of evaporator and/or
condenser tubes. Evaporator and condenser tubes are rolled into the tube sheets to permit replacement if necessary; the
length of the vessel must be allowed at one end (doors or removable wall sections can be utilized). Keep a free space to
allow the opening of electrical panel doors. Minimum clearance at all sides, including the top, is (1 meter); local
regulation may require larger clearance.
The above recommended information are representative of general installation. A specific evaluation should be done by
contractor depending on the case.