Specifications

Note: All plumbing connections are made the same way
whether or not the unit has valve packages. Whether
or not you utilize our hose kits and shutoff/balancing
valve all piping connections will have to conform with
all local piping and building codes. The ability to re-
move the unit in order to perform repairs is imperative.
Note: Valves, hoses and 90-degree elbows are factory
available accessories, to be eld-mounted by others.
Pipe Elbows
90-degree, 1/2" SWT × 1/2" FPT Cast Bronze elbow
ttings can be ordered to make sweat connections to the
unit supply and return pipe stubs to accept the threaded
connection of exible hoses.
Figure 3: 90 Degree Pipe Elbow (See Table 3 for letter
dimensions)
E
D
C
A
F
Ref.
B - Thread
Size
Table 3: 90 Degree Pipe Elbow Dimensions for Figure 3
A - Nominal
Size
A B C D E F
1/2" × 1/2" .627"/.631"
1/2"
FPT
.50 .43 .81 1.08
Condensate Hose Connection
Each unit is supplied with a 3/4" (19mm) I.D. clear vinyl
condensate hose internally trapped within the chassis.
The hose extends 14" (356mm) out of the chassis within
the piping compartment to reach the oor or the back
wall.
Field condensate piping must enter within the connes of
the cabinet (back wall or oor) similar to the supply and
return piping. Slide the vinyl hose over the condensate
pipe and clamp it.
Figure 4: Hose kit installation (field-installed)
Control Box
Escutcheon
Plate
Compressor/Control
Box Access Cover
Wiring Diagram
Fan/Coil Section Access Panel
Condensate Line–14" (356mm) Clear Vinyl
Hose Clamp
5.0"
(127mm)
9.0"
(229mm)
Air Coil
Water Return
Water Supply
Junction Box
Flexible Hoses
Ball Valves
NOTE: Valves,
(shut-off combination
balancing valves),
Hoses, (supply and
return, condensate
drain hose), also 90
o
elbows are all factory
available as accesso-
ries, to be mounted
in the field by others.
All Pipe Fittings Are
To Be Field Installed