Specifications
88 Catalog WSC/WDC-4
F. Coordinate controls with control contractor.
G. Provide all materiel required to ensure a fully operational and functional chiller.
3.2 START-UP
A. Units shall be factory charged with the proper refrigerant and oil.
B. Factory Start-Up Services: Provide for as long a time as is necessary to ensure proper
operation of the unit, but in no case for less than two full working days. During the period
of start-up, the Start-up Technician shall instruct the Owner’s representative in proper care
and operation of the unit.










