Unit installation
Table Of Contents
- Introduction
- Installation
- Physical Data
- Electrical Data
- Dimensional Data
- Startup
- Operation
- Global UNT Controller Installation and Operation
- General Description
- Optional Sensors
- Sensors and Transducers
- Control Wiring
- External Voltage Inputs
- Interlock Wiring
- Unit Set Points and Calibration
- Optional Sensors
- Field Wiring
- Power Wiring
- Power Supplies
- Analog input signals
- Digital input signals
- Remote Stop/Start
- Chilled Water Flow Switch
- Digital Outputs
- External Alarm Annunciator Circuitry
- PC Connection
- Software Identification
- Controller Inputs /Outputs
- Additional Global UNT Features
- Alarms
- Zone Terminal (Optional)
- Zone Terminal Glossary
- UNT Troubleshooting Chart
- MicroTech Controller Installation and Operation
- Sensors and transducers
- Control wiring
- Remote 4-20 milliamp signals
- Interlock wiring
- Unit set points and calibration
- Modem kit
- Lead-Lag
- Field Wiring
- Power Wiring
- Power Supplies
- Analog Input Signals
- Digital Input Signals
- Remote Stop/Start
- Chilled Water Flow Switch
- Digital Outputs
- Chilled Water Pump Relay
- External Alarm Annunciator Circuitry
- PC Connection
- Telephone line
- Software Identification
- Controller Inputs /Outputs
- Reset Options
- Soft Loading
- Manual Operation
- Compressor Staging
- Head Pressure Control
- Pumpdown Control
- Safety Systems
- Circuit Alarm Conditions
- System Alarm Conditions
- Sequence of Operation
- Start-Up and Shutdown
- Keypad / Display
- Menu Descriptions
- Trouble Analysis for the MicroTech
- Test Procedures
- Unit Maintenance
- Service

2 AGZ 035A through 065A IOMM AGZ-3
Table of Contents
Introduction....................................... 3
General Description..................................... 3
Inspection .................................................... 3
Nomenclature .............................................. 3
Installation ......................................... 4
Handling...................................................... 4
Location....................................................... 5
Service Access............................................. 5
Vibration Isolators....................................... 7
Water Piping................................................ 8
Flow Switch................................................. 9
Water Connections..................................... 10
Glycol Solutions........................................ 10
Evaporator Flow and Pressure Drop...........11
Physical Data ................................... 13
Electrical Data ................................. 15
Field Wiring............................................... 15
Dimensional Data ............................ 28
Startup.............................................. 29
Pre Start-up................................................ 29
Start-Up ..................................................... 29
Shutdown................................................... 29
Water Piping Checkout.............................. 30
Refrigerant Piping Checkout ..................... 30
Electrical Check Out.................................. 31
Operation ......................................... 32
Sequence of Operation .............................. 32
Hot Gas Bypass (Optional)........................ 33
Filter Driers ............................................... 34
System Adjustment .................................... 34
Liquid Sightglass and Moisture Indicator.. 34
Refrigerant Charging.................................. 34
Thermostatic Expansion Valve................... 34
Crankcase Heaters...................................... 35
Water Cooler..............................................35
Global UNT Controller Installation
and Operation.................................. 36
General Description................................... 36
Optional Sensors........................................ 36
Controller Inputs /Outputs ......................... 38
Additional Global UNT Features............... 42
Alarms........................................................44
Zone Terminal (Optional) .......................... 45
Zone Terminal Glossary............................. 49
UNT Troubleshooting Chart...................... 51
MicroTech Controller Installation
and Operation.................................. 52
General Description................................... 52
Optional Sensor Packages.......................... 52
Installation ................................................. 52
Sequence of Operation............................... 61
Start-Up and Shutdown.............................. 63
Keypad / Display ....................................... 64
Menu Descriptions..................................... 67
Trouble Analysis for the MicroTech .......... 78
Test Procedures.......................................... 81
Unit Maintenance............................ 88
Preventive Maintenance Schedule ............. 89
Service .............................................. 90
Liquid Line Solenoid Valve ....................... 90
Evaporator ................................................. 91
Refrigerant Charging.................................. 91
AGZ Troubleshooting Chart ...................... 93
"McQuay" is a registered trademark of McQuay International
2002 McQuay International
"Illustrations and data cover McQuay International products at the time of publication and we reserve the right to
make changes in design and construction at anytime without notice"
Our facilit
y
is ISO Certified