Operating instructions

4 IMM AGSB-60
Installation and Start-up
Note: Installation and maintenance are to be performed only by qualified personnel who are
familiar with local codes and regulations, and experienced with this type of equipment.
WARNING
Sharp edges and coil surfaces are a potential injury hazard.
Avoid contact with them.
Start-up by McQuayService is included on all units sold for installation within the USA and
Canada and must be performed by them to initiate the standard limited product warranty. Two-
week prior notification of start-up is required. The contractor should obtain a copy of the
Start-up Scheduled Request Form from the McQuay sales representative or from the nearest
office of McQuayService.
Handling
Avoid rough handling or shock due to impact or dropping the unit. Do not push or pull the
unit.
Never allow any part of the unit to fall during unloading or moving as this can result in serious
damage.
To lift the unit, lifting tabs with 2½" (64 mm) diameter holes are provided on the base of the
unit. All lifting holes must be used when lifting the unit. Arrange spreader bars and cables to
prevent damage to the condenser coils or unit cabinet (see Figure 1).
DANGER
Improper lifting or moving unit can result in property damage, severe
personal injury or death. Follow rigging and moving instructions carefully.
Figure 1, Required Lifting Method
NOTES:
1. All rigging points on a unit must
be used. See page 16 through
page 18 for location, and weight
at lifting points for a specific
size unit.
2. Crosswise and lengthwise
spreader bars must be used to
avoid damage to unit. Lifting
cables from the unit mounting
holes up must be vertical.
3. The number of lifting points,
condenser sections, and fans
can vary from this diagram.