Operating instructions
Wind Baffles and Hail Guards
Wind Baffles/Hail Guards are a field-installed option that is used to stabilize unit operation in high wind
areas and to assist in operation at low ambient temperatures.
Figure 22 is a sketch of a typical panel
assembly on an ACZ/AGZ unit. The actual number of panels and parts will vary by model size. The parts
are shown in the table below and referenced by balloon numbers.
Figure 22, Installation Sequence
Rib Attachment (First)
RIB FLANGES ON THE END
MUST POINT TO CENTER
OF COIL TO HAVE A FINISHED
LOOK. INTERIOR RIB FLANGES
CAN POINT IN ANY DIRECTION.
ATTACH ALL RIBS TO
CO
IL VERTI
C
AL
C
HANNEL
S
.
U
N
I
T
V
E
R
T
I
C
A
L
C
O
I
L
Front Panel Attachment (Second)
A
B
C
D
E
PLACE FRONT "A" AND
FASTEN TO BOTH SIDES
PLACE FRONT "B" BY LAPPING
OVER "A" AND REPEAT
ATTACHMENT PROCEDURE.
U
N
I
T
V
E
R
T
I
C
A
L
C
O
I
L
1
3
2
Top Panel Attachment (Last)
A
B
C
D
E
A
TTACH TOP "A" AT HORIZONTAL COIL CHANNEL FIRST.
THIS WILL SQUARE THE PANEL.
OVERLAP THE FRONT PANEL FLANGE.
ATTACH LEFT SIDE SECOND.
OVERLAP PANEL "B" OVER PANEL "A"
AND REPEAT ATTACHMENT PROCEDURE.
U
N
I
T
V
E
R
T
I
C
A
L
C
O
I
L
Table 15, Packing List
Description Part Number Bubble Number
26 ACZ / AGZ-BM IMM ACZ/AGZ-4










