Unit installation
IOMM ACZ/AGZ-3  ACZ / AGZ-BM  97 
Table 57, Unit Enable Conditions 
Unit Off 
Input 
Control Source 
Setpoint 
Remote 
Input 
Keypad 
Entry 
BAS 
Request 
Unit Enable 
OFF x  x x x OFF 
x SWITCHES OFF x  x  OFF 
ON SWITCHES  ON  x  x  ON 
ON KEYPAD  x OFF  x  OFF 
ON KEYPAD  x ON  x  ON 
ON NETWORK  x  x  OFF  OFF 
ON NETWORK OFF x  x  OFF 
ON NETWORK  ON  x  ON  ON 
NOTE: An “x” indicates that the value is ignored. 
Unit Mode Selection 
The operating mode of the condensing unit is set by the Available Mode Setpoint with options of 
COOL and TEST. COOL mode is the standard mode of operation. TEST is a field test mode, 
accessible only with the manager password. The unit test mode allows manual control of each 
digital output. 
Unit Test Mode 
The unit test mode allows manual testing of controller outputs. Entering this mode requires the 
following conditions: 
•  Unit OFF input = OFF (i.e., the entire chiller is shut down). 
•  Manager password active. 
•  Available Unit Mode setpoint = TEST 
A test menu can then be selected to allow activation of the outputs. It is possible to switch each 
digital output ON or OFF and set the analog outputs to any value. 
When in test mode, the compressors may be turned on, but they will automatically shut off after 10 
seconds. 
Compressor Control 
Compressor Sequencing 
This section defines which compressor is the next one to start or stop. The next section defines 
when
 the start, or stop, is to occur. 
Compressor sequencing is based primarily on compressor run-hours and starts. Compressors with 
fewer starts will start before those with more starts. Compressors that have more run-hours will shut 
off before those with less run-hours. In the event of a tie on number of starts, the lower numbered 
compressor starts first. In the event of a tie on run-hours, the lower numbered compressor shuts off 
first. 
If possible, the number of running compressors on each circuit will be balanced. If a circuit is 
unavailable for any reason, the other circuit is allowed to stage on all compressors. 
Required Parameters 
1.  Number of starts for all compressors 
2.  Number of run hours for all compressors 
3.  Status of all compressors (Available/Unavailable) 
4. Compressor number 