Unit installation
IOMM ACZ/AGZ-3  ACZ / AGZ-BM  11 
Case 5, Pit/Solid Wall Installation 
Pit installations can cause operating problems and great care should be exercised if they are to be used on 
an installation. Recirculation and restriction can both occur. A solid wall surrounding a unit is 
substantially the same as a pit and the data presented here should be used. 
Steel grating is sometimes used to cover a pit to prevent accidental falls or trips into the pit. The grating 
material and installation design must be strong enough to prevent such accidents, yet provide abundant 
open area or serious recirculation problems will occur. Have any pit installation reviewed by McQuay 
application engineers prior to installation for air-flow characteristics. The installation design engineer 
must approve the work to avoid an unreasonable risk of accident and is responsible for final design 
criteria. 
Figure 13, Pit Installation 
Figure 14, Adjustment Factor 
AGZ 075-130
ACZ 090-155
AGZ 026-070
ACZ 030-080
D=6
(1.8)
D=8
(2.4)
D=4
(1.4)
D=5
(2.0)
D=6
(1.8)
D=8
(2.4)
D=4
(1.4)
D=5
(2.0)
D=10
(3.1)
D=7
(2.1)
AGZ
075-130
ACZ
090-155
AGZ
026-070
ACZ
030-080
D=10
(3.1)
D=7
(2.1)
AGZ 075-130
ACZ 090-155
AGZ 026-070
ACZ 030-080
AGZ
075-130
ACZ
090-155
AGZ
026-070
ACZ
030-080