Install Instructions

Model TC-4
Test-N-Check
®
Valves
For Hot Water Boilers
Before using this product read and understand instructions.
Save these instructions for future reference.
All work must be performed by qualified personnel trained in the proper application, instal-
lation, and maintenance of plumbing, steam, and electrical equipment and/or systems in
accordance with all applicable codes and ordinances.
To prevent serious burns, the boiler must be cooled to 80˚F (27˚C) and the pressure must be
0 psi (0 bar) before servicing.
To prevent serious personal injury from steam blow-down, connect a drain pipe to the control
opening to avoid exposure to steam discharge.
Failure to follow this warning could cause property damage, personal injury or death.
W
A
R
N
I
N
G
C
A
U
T
I
O
N
!
WARNING
TC-U Upper Valve TC-L Lower Valve
®
Applications:
For isolation of equalizing lines during low
water cut-off testing.
Does in minutes what used to
take hours.
OPERATION
Maximum Operating Pressure: 160 psi (11 kg/cm
2
)
Maximum Operating Temperature: 250˚F (121˚C)
McDonnell & Miller
Installation & Maintenance
Instructions
MM-802(D)

Summary of content (4 pages)