Install Instructions
Model TC-4
Test-N-Check
®
Valves
For Hot Water Boilers
• Before using this product read and understand instructions.
• Save these instructions for future reference.
• All work must be performed by qualified personnel trained in the proper application, instal-
lation, and maintenance of plumbing, steam, and electrical equipment and/or systems in
accordance with all applicable codes and ordinances.
• To prevent serious burns, the boiler must be cooled to 80˚F (27˚C) and the pressure must be
0 psi (0 bar) before servicing.
• To prevent serious personal injury from steam blow-down, connect a drain pipe to the control
opening to avoid exposure to steam discharge.
Failure to follow this warning could cause property damage, personal injury or death.
W
A
R
N
I
N
G
C
A
U
T
I
O
N
!
WARNING
TC-U Upper Valve TC-L Lower Valve
®
Applications:
For isolation of equalizing lines during low
water cut-off testing.
Does in minutes what used to
take hours.
OPERATION
Maximum Operating Pressure: 160 psi (11 kg/cm
2
)
Maximum Operating Temperature: 250˚F (121˚C)
McDonnell & Miller
Installation & Maintenance
Instructions
MM-802(D)