Install Instructions

3
C
E
D
A
L
F
J
K
B
M
H
D
H
G
J
K
STEP 2 - Changing the Bellows for Mercury Switch Units (For Snap Switch See STEP 3)
c. Make sure tapped hole on float arm (K) is facing the
correct way, so the float and float rod (C) can be
screwed into it when bellows assembly is assembled
on the head casting. Place gasket (M) on casting (B).
Center the gasket and place the bellows assembly (F)
and switch housing (A) on head casting (B). Insert and
tighten six (6) Torx
®
screws (E) to 125 in. lbs. (14 N•m).
d. Screw float and float rod (C) into float arm (K) and
hand tighten. Center the float rod in the float rod
guide (not shown) and tighten Torx screw (D) to
125 in. lbs. (14 N•m). Make sure you hold the float
in place while tightening screw (D). Move the float
up and down, making sure there is no binding and
that the float rod is still centered.
b. Take the new bellow assembly (F) and disassemble it
noting the order of the parts. Put sealing washer (J) on
top of float arm (K) and insert into inside of bellows (F).
Place gasket (L) over bellows (F). Insert this assembly
into switch housing (A) and bracket (H). If the screw (D)
was an Allen
®
screw, the spacer washer (G) will have to
be put in the top hole of bracket (H). Take Torx
®
screw (D)
(furnished) and insert it into hole on top of bracket (H) and
spacer washer (G) (if needed) and screw into float arm (K).
Hand tighten only.
a. NOTE: On units that have Allen
®
head screws they should
be replaced with Torx
®
screws (furnished).
B
C
J
F
A
G
D
P
N
R
E
Step 3 - Changing the Bellows for Snap Switch Units
a. Clean out sealant and remove two (2) screws (N)
and bracket (P). Remove (6) Allen
®
or Torx
®
screws
(E). Remove switch housing (A) from head casting (B).
The switch bracket (R) will come out with the switch
housing (A). The bellows assembly (F) may stick to
the switch housing (A). Remove bellow assembly (F)
and clean gasket surfaces on both head casting (B)
and switch housing (A).