Install Instructions

3
a. Turn the boiler off.
b. Drain the water in the boiler to a level which
is below the lower gauge glass tapping (B)
of the control body (A). Allow the boiler to
cool to 80˚F (27˚C) and allow the pressure
to release to 0 psi (0 bar).
STEP 2 - Preparation
OFF
ON
a. Using a pipe wrench, remove the float blocking
tube (F) from the new control and tighten a 2"
(13mm) NPT pipe plug (G) (provided) into the
tapping on the bottom of the control body (A).
Tighten the pipe plug to 31 ft•lb (42 N•m).
When using the tape sealant on the external threads of pipes or fittings, follow the manufacturers instructions. Use
sparingly and do not place on the first thread.
!
CAUTION
STEP 3 - Installing the New Low Water Cut-Off
b. Using a pipe wrench, install a 2" (13mm)
nipple (H) into the lower gauge glass tapping
(B) and pipe tee assembly (J). Tighten both
connections to 31 ft•lb (42 N•m).
J
B
H