TROUBLESHOOTING:
If control fails to operate, perform the following diagnostic checks.
1. Check to be sure the water level in the boiler is at or above the level of the probe.
2. Re-check all wiring to ensure proper connections as specified in boiler manufacturers wiring
diagrams.
3. Check to ensure that Teflon tape has not been used on the threaded connection of the probe to
the boiler.
3. Check the quality of the boiler water to ensure adequate conductance.
Boiler Does Not Turn Off (when water is below probe)
Turn off boiler and check boiler wiring connections.
Turn off boiler, drain boiler and remove control to check if the tip of the probe is touching
a metal surface.
Boiler Does Not Turn ON
Make sure water is above the level of the probe.
Make sure probe is installed in a location where an air pocket cannot develop.
Boiler Does Not Turn ON and RB-24E Red LED blinking
Problem is wrong transformer ‘Y’ harness.
Turn off boiler and install correct transformer ‘Y’ harness.
MAINTENANCE
SCHEDULE:
Test the low water cut-off annually or more frequently.
Remove and inspect the self-cleaning probe every 5 years.
Replace the low water cut-off every 15 years.
Replace Probe if:
Teflon® insulator is cracked or wo r n .
P r obe is loose.
Failure to fo l l ow this caution could cause pro p e r ty damage, p e r sonal injury or death.
CAUTION
Clean probe by wiping with non-abrasive cloth and rinsing with clean water. DO NOT
use sharp instruments to remove any accumulations of rust or scale.
NOTE