Install Instructions

3
a. If tappings are provided on the boiler, install
the probe control in one that is above the min-
imum safe water level, as specified by the
boiler manufacturer. If no specified minimum
safe water level is designated, contact the
boiler manufacturer.
b. If no tapping is provided on the boiler,
install the probe control in a header or riser
pipe above the boiler. Refer to the Typical
Installation Diagrams below.
STEP 1 - Determine Where to Install the Low Water Cut-Off
INSTALLATION
TYPICAL INSTALLATIONS
TOOLS NEEDED:
Pipe wrench or channel lock pliers.
D e t e r mine where to install the probe control based
on the fo l l owing requirements:
On the Boiler (RECOMMENDED) In a Pipe Tee Above the Boiler