Install Instructions

6
N
H
B
C
Wired in Series
as Part of Burner
Control Circuit
BLACK
YELLOW
WHITE
120VAC
SERVICE
SWITCH
NH
(L1)
(L2)
Boiler Control
Connections
YELLOW
BB
M
c. Place the probe control’s housing cover (BB)
over the housing (M).
AA
Both Sides
d. Tighten the (2) screws (AA).
The control can be wired this way to interrupt
either a 24 VAC or 120 VAC burner control safety
circuit. Consult boiler manufacturers wiring dia-
grams to identify the safety circuit and recom-
mended location to connect the Yellow wires.
Using the boiler Service Switch as a reference,
connect wires as shown. Use wire nuts (not
furnished) to complete connections.
Connect White (N) wire as shown to 120VAC
circuit neutral wire.
Connect Black (H) wire as shown to 120VAC
circuit hot wire.
Locate Boiler Burner Safety Circuit and connect
Yellow (B) and Yellow (C) wires as shown to
interrupt circuit.
Option 2:
This diagram can be used if you are wiring the RB-122-E to interrupt power to
the boiler burner or safety circuit only.