Install Instructions

4
a. Follow the drawing to the right for piping the
valve to boiler and city water supply. When
piping the valve remember to leave room for
servicing the valve.
Models 51 / 51-2, Models 51-S / 51-S-2 and Models 53 / 53-2
For Steam or Hot Water Boilers
INSTRUCTIONS FOR PIPING THE WATER FEEDER VALVE
TOOLS NEEDED:
Two (2) pipe wrenches.
STEP 1 - Piping the Valve on Models 51/51-2
a. Follow the drawing to the right for piping the
valve to the boiler and city water supply.
When piping the valve remember to leave
room for servicing the valve.
STEP 2 -
Piping the Valve on Models 51-S/51-S-2, 53/53-2