Install Instructions

5
L
K
f. Reinstall gauge glass and trim to ‘Y’ fittings (K, L).
Note: Make sure gauge glass valves are fully open.
L
K
d. Install upper ‘Y’ fitting (K) into upper 1/2” NPT
gauge glass tapping on boiler.
Install lower ‘Y’ fitting (L) into 1/2” NPT gauge
glass tapping on boiler.
S
R
P
Q
M
BB
Z
W
T
Y
AA
V
U
X
N
O
e. Screw reducer bushing (O) and nipple (N) into top 1” NPT
tapping (P).
Screw reducer bushing (Q), nipple (R) and blow-off
valve (S) into bottom 1” NPT tapping (T).
Screw lower union tailpiece (V) with nut (U) into either
1/2” NPT lower tapping (W, X). Screw 1/2” NPT pipe
plug into unused lower tapping.
Screw upper union tailpiece (Z) with nut (Y) into ‘Y’
casting (M) 1/2” NPT tapping (AA).
Slide ‘Y’ casting (M) and compression nut (BB) over
nipple (N).
Connect upper and lower union nuts (U, Y) to ‘Y’ fittings
(K, L) installed in boiler gauge glass tappings.
Note: ‘Y’ fitting (M) will have to be moved up or down
nipple (N) to mate union halves.
Tighten compression nut (BB).