Install Instructions
INSTALLATION (cont.)
a. Remove Feeder from Tank. Turn off the water
supply and drain the tank below the level of the
feeder flange. If fluid is heated, allow system to
cool to 80°F (27°C) before disassembly.
Disconnect the piping above the strainer assem-
bly. Remove the six (6) mounting bolts and lift off
the feeder from the tank.
b. Remove Valve Assembly. Remove float and
rod from the float arm of the valve linkage.
Unscrew the two (2) bolts from the strainer body
at the bottom of the valve assembly. Unscrew
the four (4) bolts from the valve body at the bot-
tom of the valve housing bracket. Pull the valve
assembly from the housing in an arcing move-
ment to clear the float arm from the interior.
c. Reassemble with new Valve Assembly.
Position the new valve assembly with new
gasket, float arm first, into the housing. Hand
secure the four (4) bolts and tighten to 16 ft/lbs.
Replace the strainer body and new gasket using
the two (2) bolts. Tighten to 16 ft/lbs. Reattach
the float and rod onto the float arm and hand
tighten.
d. Replace Feeder on Tank. Replace the assem-
bly and new gasket onto the tank flange. Tighten
the six (6) bolts to 16 ft/lbs. Reconnect the
piping and restore water supply. Check for prop-
er closing level and leakage before leaving the
jobsite.
Note: Use new gaskets; make sure all gasket
surfaces are clean.
21 Series - Replacement Valve Assembly (SA21-6)
Housing Gasket
Housing
SA21-6
Replacement
Valve
Strainer
Assembly
MAINTENANCE:
• Blow down tank weekly during heating season.
Blow down may have to be more frequent
depending on local water conditions and the
amount of make-up water.
• Clean strainer at least twice during heating
season. Cleaning may have to be more frequent
depending on local water conditions and the
amount of make-up water.
• Replace control every 15 years.
ITT
8200 N. Austin Ave.
Morton Grove, IL 60053
tel: 847-966-3700
fax: 847-966-9052
www.mcdonnellmiller.com
McDonnell & Miller
©2007 ITT Corporation
Printed in U.S.A. 2-07 246731