Install Instructions
a. Cover Removal and Installation Procedure
• Using a flathead screwdriver, loosen but do not
remove the two cover screws and remove the
cover (A).
• Place the cover on the flow switch sliding the slots
behind the two loose cover screws. Push the cover
down into the flow switch and using a flat blade
screwdriver, tighten the cover screws to a torque
of 10 lb•in (1.13 N•m).
STEP 4 - Electrical Installation
•To prevent electrical shock, turn off the electrical power before making electrical connections.
•To  prevent  an  electrical  fire  or  equipment  damage,electrical  wiring  insulation  must  have  a  rating  of 
167˚F (75˚C) if the liquid’s temperature exceeds 180˚F (82˚C).
•To  prevent  electrocution, when  the  electrical  power  is  connected  to  the  flow  switch, do  not  touch  the 
terminals.
•Make sure flow switch electrical cover is secured before turning on electric power.
Failure to follow this warning could cause property damage, personal injury or death.
6
!
WARNING
c. Insert the flow switch into the pipe tee.Turn 
the flow switch two (2) or three (3) revolutions 
clockwise until tight. Do not put excessive 
force on cover when turning.
d. Place a 1 3/8" open end wrench on flow switch
body to tighten to final position. Final position 
is with arrow on housing aligned in the same 
direction as liquid flow.
b. Apply pipe sealing compound or Teflon tape to the 
flow switch pipe threads.
NOTE: Do not apply sealant to first threads as this 
switch is grounded (earthed) via the pipe mounting.