Install Instructions

2
OFF
ON
STEP 1 - Removal and Replacement of Contacts and Terminal Panels
a. Turn power off to boiler and all controls.
Allow boiler to cool to 80˚F (27˚C) and
reduce the pressure to 0 psi (0 bar).
TOWER TUBE
SWITCH
ASSEMBLY
TERMINAL
CONNECTIONS
SWITCH
COVER
TERMINAL
PANELS
CONDUIT
CONNECTOR
NAMEPLATE
FITTING
HUB
C
A
b. Remove and Replace Switch Assembly
Remove two screws (A) and lift off
switch cover.
Identify terminal connections for
rewiring and then disconnect all wires
from terminal panels.
Remove conduit connector and wires
from the integral fitting hub.
Remove four hex nuts (B) and carefully
lift switch assembly up and off
tower tube.
Carefully slide new switch assembly
over tower tube and secure with four
hex nuts (B). Make sure nameplate is
in same position as old unit.
Remove two screws (A) and lift switch
cover off new unit.
Install conduit fitting from old unit
with attached wires on switch assembly.
Reconnect wiring to terminal panel in
exactly the same position as removed.
Replace switch cover and fasten with
two screws (A).
Proceed to Step 2 to Test Control
There may be more than one source of power to
the boiler.
!
CAUTION