Specifications
3
3-58
McDATA Products in a SAN Environment - Planning Manual
Planning Considerations for Fibre Channel Topologies
11. Verify cascaded FICON operation - Have the customer verify
operation of established logical FICON paths between channels
and control units, and verify that cascaded FICON traffic is
transmitted through the fabric as expected.