Specifications

© Copyright IBM Corp. 2003. All rights reserved. 21
Chapter 3. Pre-installation planning
This chapter provides information and recommendations for planning the installation of a
McDATA Intrepid FICON Directors for attachment to FICON or FICON Express channels on
zSeries and 9672 G5/G6 servers.
The following topics are discussed and/or described in this chapter:
򐂰 Planning considerations
򐂰 Physical port layout
򐂰 IP addressing
򐂰 Switch numbering
򐂰 Fabric binding and Insistent Domain IDs
򐂰 Zoning
򐂰 Cables and connectors
򐂰 zSeries and 9672 G5/G6 FICON channel support
3