Service manual

2
2-10
Intrepid® 6064 Director Installation and Service Manual
Installation Tasks
CAUTION
Use safe lifting practices when moving the product.
Unpack and inspect the director.
1. Inspect shipping containers for damage. If a container is
damaged, ensure a freight carrier representative is present when
the container is opened. Unpack shipping container(s) and
inspect each item for damage. Ensurepackaged items correspond
to items listed on the bill of materials.
2. If items are damaged or missing, contact the solution center:
Phone: (800) 752-4572 or (720) 558-3910
Fax: (720) 558-3851
E-mail: support@mcdata.com
3. Locate the rack-mount position. The director is 20 inches (12 U)
high.
4. Verify all FRUs, including the SFP and XFP optical transceivers,
logic cards, fans, and power supplies are installed as ordered.
5. Open the rack-mount kit and inspect the contents. Refer to the
enclosed bill of materials and verify all parts are delivered.
6. Using installation instructions delivered with the rack-mount kit
and a #2Phillipsscrewdriver, install thedirector inthe equipment
cabinet.
DANGER
Use the supplied power cords. Ensure the facility power receptacle is
the correct type, supplies the required voltage, and is properly
grounded.
7. ConnecttheU.S.ACpowercordstotheright(PS0)andleft(PS1)
receptacles at the rear of the director (Figure 2-3).
8. Connect the remaining ends of the AC power cords to separate
(for redundancy) rack power strips.