Service manual
5
5-26
Intrepid® 6064 Director Installation and Service Manual
Removal and Replacement Procedures (RRPs)
b. Push the cam lever in and to the left to cam the power supply
into the director chassis. Ensure the locking pin is engaged in
the cam lever.
4. Disconnect the ESD wrist strap from thedirector chassis and your
wrist.
5. Inspect the power supply to ensure the green PWR OK LED is
illuminated and all amber LEDs are extinguished. If a problem is
indicated, go to Chapter 3, Maintenance Analysis Procedures
(MAPS) to isolate the problem.
6. Disengage the right-side captive pin of the cable management
assembly, then rotate the assembly 90
0
downward.
7. At the management server or at a web browser connected to the
EFCM Basic Edition interface, inspect the Event Log.Ensurean
event code 207 (power supply installed) appears in the log.
If an event code 207 does not appear in the log, go to Chapter 3,
MaintenanceAnalysisProcedures(MAPS)to isolate the problem.
8. Perform one of the following to verify power supply operation:
— If at the management server, open the Hardware View and
observe the power supply graphic to ensure no alert symbols
appearthat indicate afailure(yellow triangleor red diamond).
Ifa problemis indicated, goto Chapter3, Maintenance Analysis
Procedures (MAPS) to isolate the problem.
— If at a web browser connected to the EFCM Basic Edition
interface, open the Switch tab at the View panel and ensure no
amber LEDs illuminate that indicate a power supply failure. If
a problem is indicated, go to Chapter 3, Maintenance Analysis
Procedures (MAPS) to isolate the problem.
9. Perform the data collection procedure (Collecting Maintenance
Data on page 4-32).
10. Perform one of the following to clear the system error (ERR) LED:
— If at the management server, open the Hardware View and:
a. Right-click the front panel bezel graphic (away from a
FRU) to open a menu.
b. Click the Clear System Error Light menu selection.
— If at a web browser connected to the EFCM Basic Edition
interface: