Service manual

5
5-24
Intrepid® 6064 Director Installation and Service Manual
Removal and Replacement Procedures (RRPs)
RRP: Power Supply
Use the following procedures toremove or replace apower supply. A
list of tools required is provided.
Tools Required The following tools are required to perform these procedures.
Door key with 5/16-inch socket (provided with the FC-512
Fabricenter equipment cabinet).
ESD grounding cable and wrist strap.
Removal To remove a power supply:
1. If the director is installed in a stand-alone configuration, go to
step 2. If the director is rack-mounted, perform one of the
following:
If the director is installed in a McDATA-supplied FC-512
Fabricenter equipment cabinet, insert the 5/16" door tool into
the socket hole at the right top of the front door. Turn the tool
counter-clockwise to unlock and open the door.
If the director is installed in a customer-supplied equipment
cabinet, unlock and open the cabinet front door as directed by
the customer representative.
2. Follow ESD procedures by attaching a wrist strap to the director
chassis and your wrist (Figure 5-1).
ATTENTION! To avoidcausing machine errorsor damagewhileworkingon
the director, follow ESD procedures by connecting a grounding cable to the
director chassis and wearingan ESD wrist strap.
3. For power supply access, rotate the cable management assembly
90
0
upward until the right-side captive pin engages, locking the
cable management assembly in the up position.
4. Identify the defective power supply from the extinguished green
PWR OK LED on the supply or failure information at the
management server Hardware View.
5. Push the locking pin to the left to release the cam lever at the top
of the power supply (Figure 5-8,partA).
6. Pull the cam lever out and to the right to cam the power supply
out of the director chassis (Figure 5-8,partB).