Service manual

5
5-18
Intrepid® 6064 Director Installation and Service Manual
Removal and Replacement Procedures (RRPs)
RRP: Optical Transceiver (SFP)
Use the following procedures to remove or replace an SFP optical
transceiver from a UPM card. A list of tools required is provided.
Tools Required The following tools are required to perform these procedures.
Door key with 5/16-inch socket (provided with the FC-512
Fabricenter equipment cabinet).
ESD grounding cable and wrist strap.
Fiber-optic protective plug (provided with the director).
Protective cap (provided with the fiber-optic jumper cable).
Fiber-optic cleaning kit.
Removal To remove an SFP optical transceiver:
1. Notify the customer that the port with the defective transceiver
will be blocked. Ensure the customer system administrator sets
the attached device offline.
2. If the director is installed in a stand-alone configuration, go to
step 3. If the director is rack-mounted, perform one of the
following:
If the director is installed in a McDATA-supplied FC-512
Fabricenter equipment cabinet, insert the 5/16" door tool into
the socket hole at the right top of the front door. Turn the tool
counter-clockwise to unlock and open the door.
If the director is installed in a customer-supplied equipment
cabinet, unlock and open the cabinet front door as directed by
the customer representative.
3. Identifythe defective port transceiver from the amberLED on the
port card or failure information at the management server Port
Card View.
4. Block communication to the port (Downloading Director Firmware
and Software on page 4-41).
5. Follow ESD procedures by attaching a wrist strap to the director
chassis and your wrist (Figure 5-1).
6. Disconnect the fiber-optic jumper cable from the port:
a. Pull the keyed LC free from the port optical transceiver.