Service manual
2
Installation Tasks
2-11
Installation Tasks
10. Power on the rack power strips.
11. Inspect the front panel of each rack-mounted Ethernet hub.
Ensure each green Power LED illuminates.
12. The director powers on and performs POSTs. During POSTs:
— Amber LEDs on both CTP cards and all port cards illuminate
momentarily.
— The green LED on each CTP card (active and backup) and
each port card illuminate as the card is tested.
— Green LEDs associated with Fibre Channel ports sequentially
illuminateastheportsaretested.
13. After successful POST completion
— Bezel: POWER LED green
— Active CTP card: LED green
— Power supplies: PWR OK LEDs green
14. If a POST error or other malfunction occurs, go to Chapter 3,
MaintenanceAnalysisProcedures(MAPS)to isolate the problem.
15. Perform one of the following:
— If the director will be managed through the EFCM Basic
Edition interface, go to Task 4: Configure Director at the EFCM
Basic Edition Interface (Optional).
— If the will be managed through a management or
customer-supplied server, go to Task 5: Configure Director
Network Information (Optional) on page 2-30.
Task 4: Configure Director at the EFCM Basic Edition Interface
(Optional)
Perform these procedures to configure the director from the EFCM
Basic Edition interface. A browser-capable PC with Internet or
Ethernet LAN access is required. To open the EFCM Basic Edition
interface:
1. Connect the Ethernet patch cable (supplied with the product) to
the RJ-45 connector (labelled 10/100)atthefrontpanel.