Service manual

2
Installation Tasks
2-11
Installation Tasks
10. Power on the rack power strips.
11. Inspect the front panel of each rack-mounted Ethernet hub.
Ensure each green Power LED illuminates.
12. The director powers on and performs POSTs. During POSTs:
Amber LEDs on both CTP cards and all port cards illuminate
momentarily.
The green LED on each CTP card (active and backup) and
each port card illuminate as the card is tested.
Green LEDs associated with Fibre Channel ports sequentially
illuminateastheportsaretested.
13. After successful POST completion
Bezel: POWER LED green
Active CTP card: LED green
Power supplies: PWR OK LEDs green
14. If a POST error or other malfunction occurs, go to Chapter 3,
MaintenanceAnalysisProcedures(MAPS)to isolate the problem.
15. Perform one of the following:
If the director will be managed through the EFCM Basic
Edition interface, go to Task 4: Configure Director at the EFCM
Basic Edition Interface (Optional).
If the will be managed through a management or
customer-supplied server, go to Task 5: Configure Director
Network Information (Optional) on page 2-30.
Task 4: Configure Director at the EFCM Basic Edition Interface
(Optional)
Perform these procedures to configure the director from the EFCM
Basic Edition interface. A browser-capable PC with Internet or
Ethernet LAN access is required. To open the EFCM Basic Edition
interface:
1. Connect the Ethernet patch cable (supplied with the product) to
the RJ-45 connector (labelled 10/100)atthefrontpanel.