Service manual

4
IML, IPL, or Reset the Director
4-39
Repair Information
The status bar at the bottom of the window displays a grey
square, indicating director status is unknown.
Illustrated FRUs disappear, and appear again as the
connection is re-established.
IPL the Director (Element Manager Application)
To IPL the director from the Element Manager application:
1. At the Element Manager application, select the IPL option from
the Maintenance menu. An Information dialog box displays.
2. Click Yes to IPL the director. During theIPL, the
director-to-management server Ethernet link drops momentarily
and the following occur at the Hardware View:
Asthe networkconnectiondrops,theIntrepid6140Statustable
turns yellow, the Status field displays No Link,andtheState
field displays Link Timeout.
The status bar at the bottom of the window displays a grey
square, indicating director status is unknown.
Illustrated FRUs disappear, and appear again as the
connection is re-established.
Reset the Director (CTP Front Panel)
To reset the director from the CTP front panel:
1. Press and hold the RESET button for approximately three
seconds.
2. During the reset:
—Thegreenpower(PWR) LED on the director front panel
illuminates.
—Theambersystemerror(ERR) LED onthe directorfront panel
blinks momentarily while the director is tested.
The green LEDs associated with the Ethernet port blink
momentarily while the port is tested.
The amber LEDs associated with the ports blink momentarily
while the ports are tested.