Installation Tasks
2-75
Installation Tasks
— If the values must be changed from the management server,
refer to Task 19: Configure the Element Manager Application on
page 2-55.
4. Route a multimode or singlemode fiber-optic cable (depending
on the type of transceiver installed) from an E_Port of the fabric
element to the front of the director.
5. Connect the fiber-optic cable to a director port as directed by the
customer.
6. If the director is managed through the management server, go to
step 7. If the director is managed through EFCM Basic Edition:
a. Select Port List from the Product menu at any view. The Port
List View displays.
b. At the Port List View, click the physical port number of the
fabric ISL (connected in step 5)inthePort column. Physical
properties for the port appear in the lower panel of the view.
c. Ensure the Operational State field displays Online and the
Reason field displays N/Aor is blank.If anISLsegmentationor
other problem is indicated, go to Chapter 3, Maintenance
Analysis Procedures (MAPS) to isolate the problem. If no
problems are indicated, installation tasks are complete.
7. At the SAN management application physical map, right-click
the director icon, then select Element Manager from the pop-up
menu.
8. Click the Hardware tab. The Hardware View displays.
9. Double-click the graphical port connector used for the fabric ISL
(connected in step 5). The Port Properties dialog box displays.
10. Ensure the Link Incident field displays None,theOperational State
field displays Online,andtheReason field displays N/A or is
blank. If an ISLsegmentation or other problem is indicated, go to
Chapter 3, Maintenance Analysis Procedures (MAPS) to isolate the
problem. If no problems are indicated, installation tasks are
complete.
Task 24: Register with the McDATA Filecenter
To complete the installation, register with the McDATA Filecenter
web site to receive e-mail updates and access the following: