Service manual
2
2-36
McDATA Sphereon 4400 Fabric Switch Installation and Service Manual
Installation Tasks
To unpack, inspect, and install the server use the following steps:
1. Inspect shipping container(s) for damage. Ensure that a freight
carrier representative is present when the container is opened.
Unpack shipping container(s) and inspect each item for damage.
Ensure that the packaged items correspond to items listed on the
enclosed bill of materials.
2. Call the toll-free telephone number printed on the attached
service label if any items are damaged or missing,
3. Perform one of the following:
• Desktop installation: Position the server on a table or desktop
as directed by the customer. Ensure a grounded AC electrical
outlet is available.
• Cabinet installation: Open the rack-mount kit and inspect the
contents. Refer to the enclosed bill of materials and verify all
parts are delivered. Install the management server in the
equipment cabinet. Refer to the 1U Server Rack-Mount Kit
Installation Instructions (958-000310) for instructions.
4. Connect the server to the customer-supplied Ethernet LAN
segment or Ethernet hub (private LAN interface):
a. Connect one end of the Ethernet patch cable (supplied) as
shown in Figure 2-16, to the right RJ-45 adapter (LAN 2) at the
rear of the server.
Figure 2-16 1U Management Server Connections