Service manual
2
Task 3: Unpack, Inspect, and Install the Product
2-9
Installation Tasks
NOTE: Ensure each hub is connected to a separate rack power strip.
7. Inspect the front panel of each hub. Ensure each green Power
LED illuminates.
Task 3: Unpack, Inspect, and Install the Product
Follow the procedures in this section to unpack, inspect, and install
one or more switches. If the switch is delivered in a Fabricenter
equipment cabinet, go to Task 5: Configure Product Network Information
(Optional).
Unpack and Inspect
Switch
To unpack and inspect switch(es), use the following steps:
1. Inspect shipping container(s) for damage. Ensure that a freight
carrier representative is present when the container is opened.
Unpack shipping container(s) and inspect each item for damage.
Ensure that the packaged items correspond to items listed on the
enclosed bill of materials.
2. Contact the technical support center if any tems are damaged or
missing,:
Phone: (800) 752-4572 or (720) 558-3910
Fax: (720) 558-3851
E-mail: support@mcdata.com
Desktop Installation
To install a switch on a desktop, use the following steps:
1. Remove the backing from the three adhesive rubber pads and
apply the pads to the underside of the switch. Ensure pads are
aligned with the scribed circles.
2. Position the switch on a table or desktop as directed by the
customer. Ensure:
— Grounded AC electrical outlets are available.
— Adequate ventilation is present, and areas with excessive heat,
dust, or moisture are avoided.