Service manual

2
2-4
McDATA Sphereon 4400 Fabric Switch Installation and Service Manual
Installation Tasks
Task 1: Verify Installation Requirements
Ensure that the following requirements are met prior to product and
management interface installation. Ensure:
A site plan is prepared, configuration planning tasks are
complete, planning considerations are evaluated, and related
planning checklists are complete. Refer to McDATA Products in a
SAN Environment - Planning Manual (620-000124) for information.
Fibre Channel SAN design and director, fabric switch, and SAN
router device connectivity are evaluated, and the related
planning worksheet is complete. Refer to the McDATA Products in
a SAN Environment - Planning Manual (620-000124) for
information.
Support is available for one of the following product
management methods:
A browser-capable PC and Internet connectivity to support
the product-resident EFCM Basic Edition interface, or
A rack-mount management server or browser-capable PC and
LAN segment connectivity to support operation of SAN
management and Element Manager applications.
Support equipment and technical personnel are available for the
installation.
The required number and type of fiber-optic jumper cables are
delivered and available. Ensure that the cables are of the correct
length and have the required connectors.
A Fabricenter cabinet or customer-supplied 19-inch equipment
rack and associated hardware are available (optional).
Remote workstations or simple network management protocol
(SNMP) workstations are available (optional).
Workstations are customer-supplied and connected through a
public or dedicated LAN segment.