User`s guide
18
"Setup|Initialize External Pod" from the main menu. When pod
initialization is complete, the Run light on the front of the pod
will blink.
The pod is now ready to be connected to the system under test and
optionally to external test equipment. Proceed to the next section,
"Connecting to the System Under Test".
Connecting to the System Under Test
The I
2
C Bus Monitor Plus pod includes several ports for connecting
the pod to a system under test. These ports include:
1. I
2
C Bus Port
The I
2
C Bus port is used to connect the pod to the I
2
C Bus under
test. This port is located on the front of the pod, and uses an AMP
Shielded Data Link type connector. Input lines are provided for I
2
C
Clock, Data, and Ground, and optional System Under Test Vcc
voltage measurement.
Connect the pod to the I
2
C Bus under test using the I
2
C Bus clip lead
cable or I
2
C Bus cable provided.