Removal of Stock Down Pipe 1 Secure the vehicle on jack stands. 2. Remove the right front wheel. 3. Remove the right front inner wheel well liner. Figure 1 4. Loosen the band clamp that connects the down pipe to the front pipe. Retain the band clamp for installation. Refer to Figure 1. 5. Remove the bolt securing the down pipe to the exhaust manifold. Refer to Figure 2. 6. Remove the bolts from the rear of the front pipe located behind the torsion bar cross member. Figure 2 7.
Installation of MBRP Down Pipe 1. Feed the MBRP Down Pipe into area between the transmission and the frame. Figure 6 2. Insert the Down Pipe into the exhaust housing of the turbo completely until the flange on the turbo and Down Pipe are flush. 3. Loosely fit the stock band clamp on the upper turbo and down pipe connection to keep the Down Pipe from falling out but allowing it to rotate slightly. Refer to Figure 7. 4.
Installation of MBRP Inc. Exhaust 1. Install the three supplied 7/16” Bolts in the existing flange and place the supplied Gasket over the bolts. Refer to Figure 11. Figure 11 2. Install the Extension Pipe onto the flange. There is a slight bend in the Extension Pipe. The inside of this bend must face the driveshaft. If the outlet of the Extension Pipe angles slightly towards the driveshaft you have installed it correctly.