Instructions / Assembly

GO x 1
GP x 1
GQ x 1
GAB x 2
GAE x 2
THESE NUTS ARE NYLOC AND
ARE HARDER TO SCREW THAN
REGULAR NUTS (TO ENSURE
THEY DO NOT COME LOOSE)
NOTE:
4MM ALLEN KEY REQUIRED
CHECK THAT HANDLE “GQ
ROTATES FREELY IN THE
HOUSING “GO” BEFORE
PROCEEDING
ACTUAL SIZE
GK x 1
COMPRESS SILVER BUTTON
ON ‘GK COMPONENT TO
INSERT INTO HANDLE
ASSEMBLY
ENSURE ‘GK COMPONENT
BUTTON ENGAGES
NOTE: THE METAL BARS COME PRE-INSTALLED WITH
“SPRING PUSH PINS”, IF ONE IS MISSING IT MAY HAVE
COME LOOSE, AND CAN BE ORDERED FROM MAZE.
STEP 10
STEP 11