Specifications

F180
ON-BOARD DIAGNOSTIC
End Of Sie
6 INSPECT GENERATOR CONTROL TERMINAL
FOR SHORT TO POWER
Measure resistance between generator
terminal D (part-side) and body ground.
Is voltage B+?
Yes Repair or replace generator, then go to Step 7.
No Go to next step.
7 VERIFY TROUBLESHOOTING OF DTC P2504
COMPLETED
Make sure to reconnect all connectors.
Clear DTC from PCM memory using WDS or
equivalent.
Perform KOER self-test.
(See F66 KOEO/KOER SELF-TEST.)
Is same DTC present?
Yes Replace PCM, then go to next step.
(See F43 PCM REMOVAL/INSTALLATION.)
No Go to next step.
8 VERIFY AFTER REPAIR PROCEDURE
Perform After Repair Procedure.
(See F66 AFTER REPAIR PROCEDURE.)
Is there any DTC present?
Yes Go to applicable DTC troubleshooting.
(See F67 DTC TABLE.)
No Troubleshooting completed.
STEP INSPECTION ACTION