Specifications
INTAKE-AIR SYSTEM
F13
F
VARIABLE AIR DUCT (VAD) CONTROL SOLENOID VALVE INSPECTION (L3)
A6E391013000W03
1. Remove the VAD control solenoid valve. (See F10 INTAKE-AIR SYSTEM REMOVAL/INSTALLATION.)
2. Inspect airflow between the ports under the
following conditions.
• If not as specified, replace the VAD control
solenoid valve.
• If as specified, carry out the Circuit Open/
Short Inspection.
Circuit Open/Short Inspection
1. Disconnect the PCM connector. (See F43 PCM REMOVAL/INSTALLATION.)
2. Inspect the following wiring harness for open or
short (continuity check).
Open circuit
• If there is no continuity, the circuit is open. Repair
or replace the harness.
VAD control solenoid valve terminal B
(harness-side) and PCM terminal 4C
VAD control solenoid valve terminal A
(harness-side) and main relay terminal C
(harness-side)
Short circuit
• If there is continuity, the circuit is shorted. Repair
or replace the harness.
VAD control solenoid valve terminal B
(harness-side) and body GND
VAD control solenoid valve terminal A (harness-side) and power supply
End Of Sie
VARIABLE AIR DUCT (VAD) CHECK VALVE (ONE-WAY) INSPECTION (L3)
A6E391013000W04
1. Remove the VAD check valve (one-way). (See F10 INTAKE-AIR SYSTEM REMOVAL/INSTALLATION
2. Blow through A and verify that air flows from B.
3. Blow through B and verify that air does not flow from A.
• If not as specified, replace the VAD check valve (one-way).
End Of Sie
IDLE AIR CONTROL (IAC) VALVE INSPECTION
A6E391020661W01
Note
• Perform the following inspection only when directed.
Operation Test
1. Carry out the Idle Air Control Inspection. (See F229 Idle Air Control System Inspection.)
• If not as specified, perform the further inspection for the IAC valve.
Resistance Inspection
1. Disconnect the negative battery cable.
A6E3910W036
A6E3910W037
A6E3910W038
A6E3910W039










