Specifications

FREEZER
EVAPORATOR
REPLACING FREEZER
EVAPORATOR
Top
Mount Models
1. Disconnect
the unit from
power
source.
2. Remove
the
shelf divider
from the
treezer
compartment.
3. Install
a service valve
as
close as
you
can
to the tip
of the
process
tube,
connect a hose
and release
the
pressure
outdoors.
Remove
six
(6)
screws from
the
divider
channel
(one
at each
end and
four
(4)
along the
bottom
).
Carefully
pull
the
divider
out from
under the
center hinge.
Slide the
plastic
lreezer
chest bottom
all the way
out of the
cabinet.
Lift the
styrofoam
coil
cover out. lt
is
important
that
this
cover be returned
exactly
as it
was
when
you
reassemble
the
model.
Remove
the
air tunnel
from the treezer
back.
Disconnect
the wire
leads from
the
radiant
heater
and the termination
thermostat.
Remove
the radiant
heater
and the
termination
thermostat
from
the coil.
Disconnect
the
ground
wire from
the
drip
trough
tray.
Lift
the lreezer
coil unit
until it clears
the foam
drip tray.
Working
at the
cabinet rear,
remove
the
screws
and the
wire
cover.
Cut the
12.
13.
plastic
ties that
secure the
wiring
harness
to the heat
exchanger.
Unsolder
the
suction line from the
compressor,
and
the
capillary
tube
from
the
old drier. Remove
the old
drier.
Straighten the
bottom
of the heat
exchanger
and
bend it up about
45
degrees away from
the
cabinet back.
CABINET
REAR
14.
Pull the
evaporator
all the way
out of
the
cabinet
front
and set it
on
a
more
workable
surface.
4.
5.
6.
7.
8.
9.
10.
11.
---1-----l
=)---------i
4-11