Product Manual
Install the Top (L) to the Legs (R and Q) by Screw (H); Put Memory Controller (Y) on
desired location on front edge of top, and fasten with Screws (U).
6
7
K
G
Uninstall the Frame Mounting
Screws, Qty 2, with Wrench (K).
Install Wire Management
Tray (N) to Frame using
Screws (G) and Wrench (K).
Re-install Frame Screws thru
Wire Management Tray.
N
H
F
Y
U
Y










