Instructions / Assembly
10
Connect the plugs according to the respective labels. Connect the CTRL plug from the power supply to the CTRL plug from
the control panel. Then screw the two connections together. Last, connect the buzzer connection. See FIG-14 – FIG-18.
FIG-15 FIG-16
FIG-17 FIG-18
14. Make sure all steps are completed correctly. Plug in the power cord to your wall outlet. Turn on the sauna at
the control panel to confirm that the control panel is responding. If the control panel responds accordingly, then
proceed in putting the Roof Cover onto the Roof Panel. Make sure to pull the power cord through the
corresponding hole in the Roof Cover. See FIG 19
FIG 19 Slip the power cord through Roof Cover
15. Screw down the Roof Cover to the Roof.
16. Attach the door handle and screw into place. Screw cup-holder and magazine rack to the interior wall panel.
(Cup-holder and/or magazine rack are not available on all models.)










