Installation manual
29
11921 Slauson Ave. Santa Fe Springs, CA. 90670 (800) 227-4116 FAX (888) 771-7713
CONNECT GROUND CABLE
NOTE: To ensure power unit is correctly grounded, MAXON recommends
connecting 2 gauge ground cable from grounding bolt on pump manifold to
grounding point on vehicle frame. Use remaining length of 2 gauge cable
(Parts Box item) and 2 copper lugs (Parts Box item) to make ground cable.
1. Put heatshrink tubing (Parts Box
item) (FIG. 29-1) on each end of
ground cable and leave room for
terminal lug. Crimp copper termi-
nal lug (3/8” ring, Parts Box item)
on each end of ground cable and
shrink the heatshrink tubing (FIG.
29-2).
FIG. 29-1
COPPER TERMINAL
LUG (2 PLACES)
HEATSHRINK TUBING
(2 PLACES)
FIG. 29-2
HEATSHRINK TUBING
(2 PLACES)
3. Unbolt solenoid valve ground
wire from pump manifold (FIG.
29-3). Bolt ground cable lug and
ground wire lug to pump mani-
fold (FIG. 29-3). Tighten bolt
securely.
NOTE: MAXON recommends using dielectric
grease on all electrical connections.
CONNECTING GROUND CABLE
TO PUMP MANIFOLD
FIG. 29-3
GROUND
BOLT
2. Run ground cable through hole in
pump box wall (FIG. 29-3).
GROUND
CABLE
SOL. VALVE
GROUND WIRE
PUMP MANIFOLD
REAR VIEW
PUMP
MANIFOLD
GROUND
CABLE