Installation manual

26
11921 Slauson Ave. Santa Fe Springs, CA. 90670 (800) 227-4116 FAX (888) 771-7713
Run power cable from trailer nose to tail of trailer underside (FIG.
26-1A). Route cable around pin (install loom to protect power
cable) as shown in FIG. 26-1B.
Install cable clamps every 3 ft. approximately as illustrated in FIG.
26-1C.
RUNNING POWER CABLE ON REFRIGERATION/
SMOOTH BASE TRAILER
(UNDERSIDE VIEW)
FIG. 26-1A
NOTE: Loom and cable clamps are supplied in installation kit.
RUNNING POWER CABLE - Continued
FRAMELESS - REFRIGERATION/SMOOTH UNDERSIDE TRAILER
Never route an energized wire. Make sure the vehicle battery
is disconnected. Always route electrical wires clear of moving
parts, brake lines, sharp edges and exhaust systems. Avoid
making sharp bends in wiring. Attach securely. If drilling is
necessary, rst check behind the drilling surface to prevent
damage to any fuel lines, vent lines, brake lines or wires.
CAUTION
!
NOTE: Make sure cable is long enough to reach positive terminal
on Liftgate pump box without putting tension on the cable.
INSTALL CABLE CLAMPS AT
3 FT. APPROX.
FIG. 26-1C.
INSTALL LOOM TO CABLE.
ROUTE CABLE AROUND PIN.
FIG. 26-1B
PIN
POWER
CABLE
PUMP
BOX
LIFTGATE