Installation guide
11921 Slauson Ave. Santa Fe Springs, CA. 90670 (800) 227-4116 FAX (888) 771-7713
22
STEP 6 - BOLT ON INTERNAL CONTROL SWITCH
2. Drill 1/2“ hole through vehicle fl oor as
shown in FIGS. 22-2A and 22-2B.
BOLTING INTERNAL SWITCH BRACKET
TO VEHICLE BODY
FIG. 22-1
1. Use internal control switch bracket to
mark and drill 4 holes for mounting next
to vertical post (curb side). Bolt internal
control box to vehicle body with self-tap-
ping screws (FIG. 22-1).
18”- 24”
VEHICLE BODY
VERTICAL POST
(CURB SIDE)
HOLE DRILLED FOR WIRING
FIG. 22-2A
INTERNAL
CONTROL SWITCH
BRACKET
HOLE LOCATION
FIG. 22-2B
VERTICAL
POST
VEHICLE
WALL
VERTICAL
POST
USE 1/2”
DRILL