Assembly Instruction

Page 4 of (4)
A
B
D
C
1. Prior to installation, install the mounting
plate on the junction box with mounting
screws. Drive screws completely to the end
of the junction box.
2. Connect supply wires to wires on fixture
with wirenuts. Connect white to white,
black to black and copper wire to copper
wire as grounding connection
3. Completing the installation by pushing
the fixture into the mounting plate.
Red: Battery is charging, charging finished, the indicator light turn off.
Green: Battery powered.
Minimum charge time 15 hours.
LED indicator colors/functions.
WIRING GUIDE
Green/Yellow
Green/Yellow
SUPPLY
FIXTURE
Black(hot) Black(hot)
White(Neutral)
White(Neutral)
SWITCH
Black(hot) Red
White(Neutral)