Installation Instructions
17
INSTALLATIONINSTRUCTIONS
Pleaserefertothefollowingfigureforthe
distancemeasurementbetweenthescrew
bolts.
Pleaseinstallwith10hangingscrewbolts.
Thehandlingtotheceilingvariesfromthe
constructions,consulttheconstruction
personnelsforthespecificprocedures.
Thesizeoftheceilingtobehandled----do
keeptheceilingflat.Consolidatetheroof
beamforpossiblevibration.
Cutofftheroofbeam.
Strengthentheplacecutoff,andconsolidate
theroofbeam.
Carryoutthepipeandlineoperationinthe
ceilingafterfinishingtheinstallationofthe
mainbody.Whilechoosingwheretostartthe
operation,determinethedirectionofthepipes
tobedrawnout.Especiallyincasethereisa
ceiling,positiontherefrigerantpipes,drain
pipes,indoor&outdoorlinestotheconnection
placesbeforehangingupthemachine.
Theinstallationofhangingscrewbolts.
4.2Indoorunitinstallation
4.3WallMountingInstallation
1.Installing10hangingscrewbolts
(4bolts).
2.Woodenconstruction
Putthesquaretimbertraverselyoverthe
roofbeam,theninstallthehangingscrew
bolts.(RefertoFig.42-2)
3.Newconcretebricks
Inlayingorembeddingthescrewbolts.
(RefertoFig.42-3)
4.Fororiginalconcretebricks
Useembeddingscrewbold,crock
andstickharness(RefertoFig.42-4).
5.Steelroofbeamstructre
Installandusedirectlythesupporting
anglesteel.(RefertoFig.42-5)
Hangingscrewbolts
Ceiling
Timberoverthebeam
Roofbeam
(Bladeshapeinsertion)
(Slideinsertion)
Steelbar
Embeddingscrewbolt
(Pipehangingandembeddingscrewbolt)
Fig.42-2
Fig.42-3
Fig.42-5
Fig.42-6
Fig.42-4
Hangingscrewbolt
Hangingbolts
Supporting
anglesteel
E.Connectingpointof
refrigerantpipe
(D.gasside)
D.Connectingpointof
refrigerantpipe
(E.Liquidside)
Drainpoint
Hook










