Installation Instructions
10
INSTALLATIONINSTRUCTIONS
ThelengthcouldbecalculatedfromFig.17:
Length=210+L(ingeneral,Lishalfofthewhole
lengthoftheinstallationhook)
c.Pleaseadjustthehexangularnutsonthefour
installationhooksevenly,toensurethebalance
ofthebody.
Usethetransparenthosefilledwithwatertocheck
theleverofthemainbodyfromthefoursidesor
diagonallinedirection,theleverindicatoralso
canchecktheleverfromfoursidesofthemain
bodyRefertoFig.18)
Ifthedrainpipeisawry,leakagewillbecaused
bythemalfunctionofthewater-levelswitch.
Adjustthepositiontoensurethegapsbetween
thebodyandthefoursidesofceilingareeven.
Thebody'slowerpartshouldsinkintotheceiling
for10~12mm(RefertoFig.17).
Locatetheairconditionerfirmlybywrenchingthe
nutsafterhavingadjustedthebody'spositionwell.
.(
2.InstallThePanel
(1)Removetheinletgrid.
CAUTIONS
Neverputthepanelfacedownonflooror
againstthewall,oronbulgyobjects.
Nevercrashorstrikeit.
a.Slidetwogridswitchestowardthemiddle
atthesametime,andthenpullthemup.
(RefertoFig.21)
b.Drawthegriduptoanangleofabout30,
andremoveit.(RefertoFig.22)
o
Newbuilthousesandceilings
a.Inthecaseofnewbuilthouse,thehookcanbe
embeddedinadvance(refertotheA.bmentioned
above).Butitshouldbestrongenoughtobearthe
indoorunitandwillnotbecomeloosebecauseof
concreteshrinking.
b.Afterinstallingthebody,pleasefastentheinstall-
ationpaperboardontotheairconditionerwithbolts
(M516)todetermineinadvancethesizesand
positionsoftheholeopeningonceiling.Please
,firstguaranteetheflatnessandhorizontalofceiling
wheninstallingit.RefertotheA.amentioned
aboveforothers.
c.RefertotheA.cmentionedaboveforinstallation.
d.Removetheinstallationpaperboard.
×
Fig.16
Ceiling
Panel
Hook
A
Nut
Body
600
Fig.17
Ceiling
Body
Fig.18
Fig.19
Colourless
transparentpipe
Horizontal
indicator
Fig.20
Body
Fixinghole
Installation
paperboard
ScrewM516
×
(Accessory)
Installation
paperboard
Hookhole
Centralhole
Gridswitch
Fig.21
Fig.22










