Manual
Manual CT100-IP & CT125-IP                 April 2009 
www.max-power.com  8 
12. CONTROL PANEL INSTALLATION 
Control panels should be protected from the natural elements while the thruster is not in 
use. 
Install  the  control  panel(s)  in  easily  accessible  positions,  without  obstructing  the  main 
engine and/or steering controls. 
When fixing the  panel with the  stainless steel screws, make  sure  to install the pre-cut 
rubber seal, as supplied with the panel, ensuring that it is in the correct place. 
 Only when totally finished and satisfied with the wiring and positioning of the unit, 
clip-on the face panel/cover. 
Please  note  that  panels  are  only  fully  waterproof  from  the  front,  if  installed  correctly. 
However  the  area  behind  the  dashboard  should  be  kept  dry  to  avoid  the  risk  of 
oxidization of the cable connecter contacts. 
For full control panel installation instructions, please refer to the “Installation 
Guidelines" as supplied with each control panel. 
13. TESTS 
 Activiating the thruster when the boat is out of the water, is not advised under 
any circumstances. 
Tests must be carried out with the  boat in the water, the battery(ies) charged at 
100% and in charge, and the engines running. 
The maximum continuous operating runtime corresponds to S2-3mn norm.  
However, this can be affected by the ambient temperature. 










