Installation Instructions
Table Of Contents
- nanoLTE E61 AP Hardware Installation
- Table of Contents
- 1 Introduction
- 2 Installation Overview and Requirements
- 3 nanoLTE E61 AP Commissioning
- 3.1 Requirements for Commissioning with the Web Page
- 3.2 Redirector First Contact and NTP Synchronisation for Software Update
- 3.3 Configure a Commissioning Terminal
- 3.4 Access the Commissioning Web Page for the LTE AP
- 3.5 Optional - Software Download
- 3.6 Configure the Connection to the NOS Server
- 3.7 Commissioning Complete
- 4 nanoLTE E61 AP Hardware Installation
- 5 Troubleshooting
- 6 AP and PSU Regulatory Information
nanoLTE E61 AP Hardware Installation nanoLTE E61 AP Hardware Installation
NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 22
4 nanoLTE E61 AP Hardware Installation
The topics in this section are:
• 4.1 Unpack the E61 AP
• 4.2 Cable Connections
• 4.3 Mount the E61 AP on a Wall or Ceiling
4.1 Unpack the E61 AP
1) Unpack the AP and its accessories.
Box contents may vary, but typically the box should contain the following:
• E61 AP unit with mounting bracket attached
• Extraction tool for removing the AP from its mounting bracket
• Mains power adaptor unit
• Set of 4 screws and wall plugs for the mounting bracket
Note: The screws and wall plugs are suitable for solid walls. It may be
necessary to source alternative fixings if they are not suitable for the type
of wall material on site.
2) Check that the serial numbers on the AP unit match the label on the box.
3) Check that the items have not been damaged in transit.
For any damaged units, contact the supplier immediately for returns advice.