Installation Instructions
Table Of Contents
- nanoLTE E61 AP Hardware Installation
- Table of Contents
- 1 Introduction
- 2 Installation Overview and Requirements
- 3 nanoLTE E61 AP Commissioning
- 3.1 Requirements for Commissioning with the Web Page
- 3.2 Redirector First Contact and NTP Synchronisation for Software Update
- 3.3 Configure a Commissioning Terminal
- 3.4 Access the Commissioning Web Page for the LTE AP
- 3.5 Optional - Software Download
- 3.6 Configure the Connection to the NOS Server
- 3.7 Commissioning Complete
- 4 nanoLTE E61 AP Hardware Installation
- 5 Troubleshooting
- 6 AP and PSU Regulatory Information
nanoLTE E61 AP Hardware Installation Installation Overview and Requirements
NANO_INST_43325 v205_0.6 for N4G_2.5 © ip.access Limited 2019 Page 9
2.3.5 E61 AP Physical Requirements
An E61 AP is installed by attaching its mounting bracket to a wall or ceiling, then fitting the
AP onto the mounting bracket.
Pay attention to ensure that air can circulate freely around the unit.
It is recommended to install the AP with its front surface facing the area requiring cellular
coverage, unobstructed by walls or partitions that may cause significant RF attenuation.
Dimensions and weight with
moutning bracket
Height 220mm
Width 290mm
Depth 67.1mm
Approximate Weight 1.6kg
Environmental Cooling Vents on all sides must be kept clear
of obstructions
Operating Temperature 0°C to +45°C - wall mounted
0°C to +35°C - ceiling mounted
Operating Humidity 10 to 70% non-condensing