Owner`s manual

14
ASSEMBLY STEP 3
A Open RED AND GREEN HARDWARE
BAGS.
B Attach the GUIDE RAIL SET to the
MAIN FRAME using 4 BOLTS (F), 4
SPRING WASHERS (E) and 4 FLAT
WASHERS (D).
C Attach the GUIDE RAIL SET to the
INCLINE BRACKET using 4 BOLTS
(G), 4 FLAT WASHERS (H), 4
SPRING WASHERS (I) and 4 NUTS
(J).
BUTTON HEAD BOLT(M8x15L)
SPRING WASHER
FLAT WASHER
Z53
Z51
Z52
4
4
4
8ARC WASHERZ42
BUTTON HEAD BOLT(M8x50L)Z41 8
SPRING WASHERZ43 8
RED HARDWARE BAG :
D43
Z42
Z53
Q07
Z51
AD4
Z52
Z41
Z43
Z42
Z41
Z42
Z43
GREEN HARDWARE BAG :