Specifications
Matrix
Matrix Boiler Only
VERSION DATE: 2-7-08
1.0 SPECIFICATIONS .....................................................................3
1.1 High Altitude Operation ..........................................................3
2.0 INSTALLATION REQUIREMENTS.............................................4
2.1 Location ................................................................................5
3.0 VENTING ..................................................................................6
Attaching Vent Piping to Boiler .....................................................6
3.1 Vent Pipe Material..................................................................7
3.2 Venting Configurations ...........................................................7
3.3 Venting Rules and Guidelines.................................................9
3.4 Venting Clearances..............................................................10
3.5 Determining Vent Lengths ....................................................10
3.6 Outdoor Venting...................................................................11
4.0 CONDENSATE DRAIN ............................................................12
5.0 INSTALLING GAS PIPING.......................................................13
5.1 Installation...........................................................................13
5.2 Testing and settings .............................................................13
6.0 BOILER PLUMBING................................................................15
6.1 Plumbing (Minimum Requirements).......................................16
6.2 Matrix Boiler Connections.....................................................17
6.3 Hydronic Heating Additions (Optional) ...................................17
7.0 DOMESTIC HOT WATER SYSTEM..........................................23
7.1 Operation and Set-up...........................................................23
7.1.2 Matrix DHW with Storage...................................................25
8.0 WIRING...................................................................................26
8.1 Field Wiring to Matrix............................................................26
8.2 Matrix Factory Wiring Schematic...........................................27
9.0 CONTROL SETUP...................................................................29
9.1 Controller Displays...............................................................29
9.2 Operation and Set-up...........................................................30
9.3 Outdoor Sensor Operation....................................................32
10.0 MATRIX BLOWER OPERATION............................................33
10.1 Forced Air Heating .............................................................33
10.2 Duct Sizing ........................................................................34
11.0 HEAT RECOVERY VENTILATION .........................................35
11.1 Ventilation Needs ...............................................................35
11.2 Types of Installation ...........................................................36
11.3 Damper Box ......................................................................37
11.4 Condensate Drain..............................................................37
11.5 HRV Balancing ..................................................................38
12.0 LIGHTING BOILER................................................................40
12.1 Initial Start-Up....................................................................40
12.2 Re-Lighting Unit .................................................................40
12.3 Turn Off Appliance .............................................................40
13.0 TROUBLE SHOOTING ..........................................................41
14.0 SEQUENCE OF OPERATION ................................................45
15.0 INSTALLATION CHECKLIST.................................................46
16.0 ANNUAL MAINTENANCE AND INSPECTION ........................47
16.1 Combustion Chamber Cleaning ..........................................47
16.2 HRV/Air Handler Maintenance ............................................47
17.0 PARTS LIST..........................................................................48
18.0 WARRANTY..........................................................................49
Table of Contents
US Models